Operating globally
Over 400 solar installations per year
Over 15 years of experience
Reference project

Ground-mounted PV system for the Duisburg Gateway Terminal

The Duisburg Gateway Terminal (DGT) is set to become the largest container terminal in the European hinterland. As part of the enerPort II project, we contributed to making the Port of Duisburg climate-neutral.

Ground-mounted PV system for the Duisburg Gateway Terminal
Capacity
Location
Duisburg, Nordrhein-Westfalen
Country
Deutschland
Year
2024

Challenge

The goal of enerPort II is climate-neutral port operations. To achieve this, a battery storage system, an electrolysis plant and a ground-mounted PV system are being installed, among other things. We delivered the ground-mounted system – on an area that previously served as a coal island for storing power-station coal.

Solution

Surplus solar power is stored directly in the neighbouring battery storage system or converted into hydrogen in the electrolysis plant. In this way, a formerly fossil-fuel section of the port becomes a building block of the energy transition.

Kontakt aufnehmen mit Centroplan

Talk to us about your project

Just like here in Duisburg, we develop, build and operate your system as general contractor – all from a single source.

Book an appointment